# Sewer Connection Diagram

- Summary: Overview This document is a technical engineering diagram titled "Service Connection to Sanitary Sewer with Trap and Vent. " It provides specifications for connecting a building's plumbing system…
- Source: Ebensburg Borough
- Published: 
- Captured: 2026-08-10T16:42:10.366Z
- Source URL: http://ebensburgpa.com/wp-content/uploads/2016/04/Lateral-Detail.pdf
- Content URL: https://ebensburg.site/document/sewer-connection-diagram/
- Content note: This portable copy is not the official record and may include an automated convenience summary. Verify important details in the original document.

Overview This document is a technical engineering diagram titled "Service Connection to Sanitary Sewer with Trap and Vent. " It provides specifications for connecting a building's plumbing system to the municipal sanitary sewer, specifically detailing requirements for backflow prevention and venting. Key Components and Specifications The diagram outlines the following hardware and installation standards: Frame and Cover: Must be East Jordan Iron Works Inc. (Pattern No. 1565) or Neenah Model No. R-1975-A2 (or equal). Piping Material: The trap, vent, and cleanout assembly must be PVC, Schedule 40 pipe and fittings. Connection to Lateral: Use a coupling of the same type as the pipe (SDR-35) or adapt to Sch. 40 if applicable. Cleanout: A cleanout pipe is required with a length as needed (req'd). Backflow Prevention: A backflow prevention device is marked as optional but recommended. Venting: An air vent cap is required, extending at least 12 inches above the ground. Installation Dimensions and Clearances Minimum Depth: The assembly must be buried at a minimum depth of 2 feet, 8 inches. Clearance: There must be a minimum of 24 inches between the vertical stack and the building wall. Building Wall Proximity: The sanitary tee connection to the building sewer must be no more than 5 feet, 0 inches from the building wall. Concrete Encasement: The view port stack requires Class "A" concrete and full-depth AASHTO #57 aggregate with a 1/2-inch minimum void all around. Notes A 4-inch view port stack is acceptable in cases where the service stub is 4 inches. The diagram includes a "Property or Easement Line" indicator to ensure proper placement relative to property boundaries.
