# Ebensburg Borough Recreation Board Agenda

- Summary: Ebensburg Borough Recreation Board Agenda (August 13, 2025) Old Business Updates YPCC (Young People's Christian Center) Roof Repair: A bid proposal has been prepared and will be published in the…
- Source: Ebensburg Borough
- Published: 2025-08-13
- Captured: 2026-08-10T16:42:10.366Z
- Source URL: https://ebensburgpa.com/wp-content/uploads/2025/08/Rec-Board-Agenda-Aug-2025.pdf
- Content URL: https://ebensburg.site/document/rec-board-agenda-aug-agenda/
- Content note: This portable copy is not the official record and may include an automated convenience summary. Verify important details in the original document.

Ebensburg Borough Recreation Board Agenda (August 13, 2025) Old Business Updates YPCC (Young People's Christian Center) Roof Repair: A bid proposal has been prepared and will be published in the Tribune Democrat on August 9th and 12th. Hockey Rink: A survey is to be discussed; data is available upon request. Bingo: The next bingo event is scheduled for September 19, 2025. Pool Storm Damage: The borough manager and engineer evaluated creek damage from the June 17th storm/flooding. Cleanup plans are underway. Movie Night: Scheduled for August 15, 2025. Season End: The last day of the season is September 1, 2025. An updated schedule has been posted online. Tennis Center Safety: The new fire alarm system is fully installed. SFU Partnership: Jamie Taylor will discuss the change from D1 to D3 status with SFU and what this means for court time at the tennis center. Memorial Ballfields Security: A security alarm and lock system have been installed on the concession stand door, bathrooms, and shed. The men's room door requires fixing or replacement to close automatically (ongoing). Grant Status: A grant application is pending. Notifications are expected between September and October 2025. New Business YPCC Halloween Party: Scheduled for Sunday, October 26, 2025, from 3:00 PM to 5:00 PM. Volunteers are needed to help plan vendors, trick-or-treat bags, food trucks, and decorations. Gymnasium Closure: The gym will need to be closed for 5–7 days for roof repairs, with dates dependent on bids and scheduling. Memorial Ballfields Field Improvements: EYL and ESA have requested that the remaining two ball fields be crowned with proper drainage added. A meeting regarding these plans occurred on August 7, 2025. The group is currently waiting to see if the grant is awarded. Meeting Schedule Next Meeting: Wednesday, September 10, 2025, at 6:30 PM at the Borough building.
