Ebensburg Bulletin - July 2014
View original document →
(1 MB)
West High Street Changes in 2015
The Borough is undertaking several major construction projects along West High Street starting in Spring 2015:
- Bridge Replacement: The bridge near the Sheetz store will be replaced. Traffic will be regulated by temporary signals, and a turning lane onto New Germany Road will be added.
- New Sheetz Store: A new store is being built on the site of Falchini Beverage. Seven existing buildings will be razed to make room for the new store and gas pumps.
- Falchini Beverage Relocation: Falchini Beverage is moving to the opposite side of West High Street near Park Street.
- Sidewalks: New sidewalks and curbs will be installed along West High Street between the new Sheetz bridge and Beech Street.
Stormwater Management Project
A new stormwater utility fee is being established to fund necessary improvements.
- The Problem: The current system cannot handle heavy flows, causing flooding in streets and basements.
- The Solution: Pennsylvania Act 68 of 2013 allows the Borough to administer stormwater as a utility.
- Cost & Funding: The total cost to fix deficiencies is $7. 2 million, with $2. 2 million allocated for three priority projects.
- The Fee: Residential properties will be assessed a fee of $96 annually. This is being phased in over two years:
- First Year: $48 annually ($8 per bi-monthly bill).
- Second Year: $96 annually ($16 per bi-monthly bill).
- Commercial Properties: Fees are based on the actual amount of impervious surface.
Police Department
- New Hire: Christopher Bopp has been hired as a full-time police officer. He previously served as a part-time officer since 2012 and is a graduate of the Greater Johnstown Police Academy.
Community Events & Safety
- Crosswalk Safety: Drivers are reminded to yield to pedestrians at non-signalized intersections. New signs have been installed, and the speed limit in downtown is 35 m. p. h.
- Concerts in the Park: Held at Penn Eben Park on August 1, 8, 15, and 22 from 6pm to 9pm.
- Downtown Shutdown: Held on Friday, July 25th from 7pm to 11pm. The entertainment is J. D. Eicher & The Goodnights.
- Street Trees: Property owners are responsible for maintaining trees on their property, including removing dead limbs and keeping the grass trimmed.
Borough Council
- President: Doug Tusing
- Vice President: Susan Barber
- Members: Cecilia Houser, Theresa Jacoby, Dave Kuhar, Joe Lutz, V. Joseph Miller
- Mayor: Randy Datsko
- File size
- 1 MB