# Ebensburg Bulletin - July 2014

- Summary: West High Street Changes in 2015 The Borough is undertaking several major construction projects along West High Street starting in Spring 2015: Bridge Replacement: The bridge near the Sheetz store…
- Source: Ebensburg Borough
- Published: 
- Captured: 2026-08-10T16:42:10.366Z
- Source URL: http://ebensburgpa.com/wp-content/uploads/2016/05/July-2014-Newsletter-Final1.pdf
- Content URL: https://ebensburg.site/document/july-2014-newsletter/
- Content note: This portable copy is not the official record and may include an automated convenience summary. Verify important details in the original document.

West High Street Changes in 2015 The Borough is undertaking several major construction projects along West High Street starting in Spring 2015: Bridge Replacement: The bridge near the Sheetz store will be replaced. Traffic will be regulated by temporary signals, and a turning lane onto New Germany Road will be added. New Sheetz Store: A new store is being built on the site of Falchini Beverage. Seven existing buildings will be razed to make room for the new store and gas pumps. Falchini Beverage Relocation: Falchini Beverage is moving to the opposite side of West High Street near Park Street. Sidewalks: New sidewalks and curbs will be installed along West High Street between the new Sheetz bridge and Beech Street. Stormwater Management Project A new stormwater utility fee is being established to fund necessary improvements. The Problem: The current system cannot handle heavy flows, causing flooding in streets and basements. The Solution: Pennsylvania Act 68 of 2013 allows the Borough to administer stormwater as a utility. Cost & Funding: The total cost to fix deficiencies is $7. 2 million, with $2. 2 million allocated for three priority projects. The Fee: Residential properties will be assessed a fee of $96 annually. This is being phased in over two years: First Year: $48 annually ($8 per bi-monthly bill). Second Year: $96 annually ($16 per bi-monthly bill). Commercial Properties: Fees are based on the actual amount of impervious surface. Police Department New Hire: Christopher Bopp has been hired as a full-time police officer. He previously served as a part-time officer since 2012 and is a graduate of the Greater Johnstown Police Academy. Community Events & Safety Crosswalk Safety: Drivers are reminded to yield to pedestrians at non-signalized intersections. New signs have been installed, and the speed limit in downtown is 35 m. p. h. Concerts in the Park: Held at Penn Eben Park on August 1, 8, 15, and 22 from 6pm to 9pm. Downtown Shutdown: Held on Friday, July 25th from 7pm to 11pm. The entertainment is J. D. Eicher & The Goodnights. Street Trees: Property owners are responsible for maintaining trees on their property, including removing dead limbs and keeping the grass trimmed. Borough Council President: Doug Tusing Vice President: Susan Barber Members: Cecilia Houser, Theresa Jacoby, Dave Kuhar, Joe Lutz, V. Joseph Miller Mayor: Randy Datsko
