# Inframark WWTP Report

- Summary: Ebensburg Municipal Authority: August 2025 WWTP Monthly Report Date: September 22, 2025 Prepared by: Luke Byrne, Project Manager This report details the operations and maintenance of the Ebensburg…
- Source: Ebensburg Borough
- Published: 2025-09-22
- Captured: 2026-08-10T16:42:10.366Z
- Source URL: https://ebensburgpa.com/wp-content/uploads/2025/09/August-2025-operating-report-WWTP.pdf
- Content URL: https://ebensburg.site/document/inframark-wwtp-report-9-22-2025/
- Content note: This portable copy is not the official record and may include an automated convenience summary. Verify important details in the original document.

Ebensburg Municipal Authority: August 2025 WWTP Monthly Report Date: September 22, 2025 Prepared by: Luke Byrne, Project Manager This report details the operations and maintenance of the Ebensburg wastewater treatment facility for August 2025. Executive Summary & Operations Wastewater Volume: The plant treated a total of 16,173,900 gallons, averaging 521,738 gallons per day. Sludge Disposal: The centrifuge was operated twice, resulting in 8. 69 tons of dry sludge being sent to the landfill. Equipment Repairs: UV Unit: A faulty contactor was identified and replaced after the UV unit's coolant pump failed. A spare part was purchased. Centrifuge: An emergency stop was required when the polymer mixing chamber became clogged and broke. Maintenance Activities: Ongoing duckweed removal was performed. The process water control valve became clogged, requiring maintenance on the effluent tank. A new faucet was installed in the lab sink. Sewer lift stations were inspected regularly; no leaks were found, and basket screeners were cleaned. Dodson Electric continued work on conduit projects in the headworks. Financial Update Maintenance Expenditures: Teledyne Instruments: $272. 42 (Sampler tubes) Amazon: $203. 65 (Lab faucet/plumbing fixtures) Tractor Supply: $184. 40 (Weed killer/hydraulic fluid) Sheetz: $49. 29 (Fuel for mower/pumps) Ace Hardware: $46. 57 (Toilet repairs) Grainger: $38. 16 (SBR hoist clamps) Long Barn: $13. 99 (UV Hose) Budget Caps: Maintenance Cap: $11,430. 50 remaining (of a $25,950. 84 annual contract). Sludge Cap: $22,832. 56 remaining (of an $83,042. 76 annual contract). Chemical Cap: $10,846. 84 remaining (of a $23,251. 92 annual contract). Health & Safety There were no accidents or injuries reported in August. Personnel have worked 2,039 days (5 years and 8 months) without an accident. Training: Weekly tailgate meetings were held, along with training on the UV coolant electrical schematic and headworks wash bar function. Personnel The following staff members are certified for their respective roles: Randy Lauer (Operator II): PA Class A, E; Wastewater Subclass 1,2,3,4 Kyle Smiley (Operator II): PA Class A, E; Water Subclass 1,10,11,12 Tony Perott (Operator I): PA Class C, E; Water Subclass 1,6,7,8,12 Shawn Jones (Operator in Training): Training for PA DEP exam Cody Williams (Operator in Training): Training for PA DEP exam Luke Byrne (Project Manager): PA Class A, E; Water Subclass 1,7,8,10,11,12; Wastewater Upcoming Items ("On the Radar") SCADA programming Process water cover installation Grit blower repairs Drying bed clean out Scheduled Maintenance: Cummins generator annual maintenance is scheduled for all three onsite generators on September 24th.
