Inframark WWTP Report
View original document →
Executive Summary
Inframark submitted the June 2026 monthly report for the Ebensburg wastewater treatment facility. Key operational highlights include:
- Volume: The plant treated 29,253,000 gallons of wastewater (averaging 641. 76 gallons per day).
- Sludge: The centrifuge was operated weekly, sending 10. 94 tons of dry sludge to the landfill.
- Maintenance:
- Replaced a faulty exhaust fan motor in the headworks building.
- Installed new conduit and an electric solenoid for automated wash cycles on the screening unit.
- Repaired the effluent sample fridge by replacing the power supply and thermostats.
- Addressed overheating issues in the blower building (caused by warm weather) that led to a decanter failure on #4 SBR.
- Corrected wet end bearing temperature issues on the centrifuge.
- Grounds: Repaired lawns and re-planted process water tank excavations.
Financial Caps
The following table outlines the budget status for the current contract year:
| Category | Contract Total per Year | Previous Balance | Total Spent this Month | Remaining Balance |
|---|---|---|---|---|
| Maintenance Cap | $26,664. 12 | $17,767. 81 | $3,783. 76 | $13,984. 05 |
| Sludge Cap | $85,325. 04 | $57,492. 66 | $7,271. 78 | $50,220. 88 |
| Chemical Cap | $23,890. 92 | $15,358. 92 | $2,808. 00 | $12,550. 92 |
Health & Safety
- Accidents: There were no accidents in June.
- Safety Record: Personnel have worked 2,342 days (6 years and 6 months) without an accident or injury.
- Training: Staff participated in weekly tailgate meetings, safety flash reports, and process control meetings.
Upcoming Items ("On the Radar")
- SCADA programming
- Lawn repairs
- Influent splitter box lid repair
- SBR #2 air valve
- UV ballast wire
Personnel
The following staff members are listed with their titles and certifications:
- Randy Lauer (Operator II): PA Class A, E; Wastewater Subclass 1,2,3,4
- Kyle Smiley (Operator III): PA Class A, E; Water Subclass 1,10,11,12; Wastewater Subclass 1
- Tony Perott (Operator I): PA Class C, E; Water Subclass 1,6,7,8,12
- Shawn Jones (Mechanic II): NA
- Joseph Pompa (Operator in Training): Training for PA DEP exam
- Joseph Blythe (Operator in Training): Training for PA DEP exam
- Luke Byrne (Project Manager): PA Class A, E; Water Subclass 1,7,8,10,11,12; Wastewater Subclass 1,3,4