- Summary: Executive Summary Inframark submitted the June 2026 monthly report for the Ebensburg wastewater treatment facility. Key operational highlights include: Volume: The plant treated 29,253,000 gallons…
- Source: Ebensburg Borough
- Published: 2026-07-27
- Captured: 2026-08-10T16:42:10.366Z
- Source URL: https://ebensburgpa.com/wp-content/uploads/2026/07/June-2026-operating-report-WWTP.pdf
- Content URL: https://ebensburg.site/document/inframark-wwtp-report-7-27-2026/
- Content note: This portable copy is not the official record and may include an automated convenience summary. Verify important details in the original document.

Executive Summary Inframark submitted the June 2026 monthly report for the Ebensburg wastewater treatment facility. Key operational highlights include: Volume: The plant treated 29,253,000 gallons of wastewater (averaging 641. 76 gallons per day). Sludge: The centrifuge was operated weekly, sending 10. 94 tons of dry sludge to the landfill. Maintenance: Replaced a faulty exhaust fan motor in the headworks building. Installed new conduit and an electric solenoid for automated wash cycles on the screening unit. Repaired the effluent sample fridge by replacing the power supply and thermostats. Addressed overheating issues in the blower building (caused by warm weather) that led to a decanter failure on #4 SBR. Corrected wet end bearing temperature issues on the centrifuge. Grounds: Repaired lawns and re-planted process water tank excavations. Financial Caps The following table outlines the budget status for the current contract year: Category Contract Total per Year Previous Balance Total Spent this Month Remaining Balance Maintenance Cap $26,664. 12 $17,767. 81 $3,783. 76 $13,984. 05 Sludge Cap $85,325. 04 $57,492. 66 $7,271. 78 $50,220. 88 Chemical Cap $23,890. 92 $15,358. 92 $2,808. 00 $12,550. 92 Health & Safety Accidents: There were no accidents in June. Safety Record: Personnel have worked 2,342 days (6 years and 6 months) without an accident or injury. Training: Staff participated in weekly tailgate meetings, safety flash reports, and process control meetings. Upcoming Items ("On the Radar") SCADA programming Lawn repairs Influent splitter box lid repair SBR #2 air valve UV ballast wire Personnel The following staff members are listed with their titles and certifications: Randy Lauer (Operator II): PA Class A, E; Wastewater Subclass 1,2,3,4 Kyle Smiley (Operator III): PA Class A, E; Water Subclass 1,10,11,12; Wastewater Subclass 1 Tony Perott (Operator I): PA Class C, E; Water Subclass 1,6,7,8,12 Shawn Jones (Mechanic II): NA Joseph Pompa (Operator in Training): Training for PA DEP exam Joseph Blythe (Operator in Training): Training for PA DEP exam Luke Byrne (Project Manager): PA Class A, E; Water Subclass 1,7,8,10,11,12; Wastewater Subclass 1,3,4