- Summary: Executive Summary of Operations Inframark submitted the May 2026 monthly report for the Ebensburg wastewater treatment plant (WWTP) to the Borough of Ebensburg. Key operational statistics and…
- Source: Ebensburg Borough
- Published: 2026-06-22
- Captured: 2026-08-10T16:42:10.366Z
- Source URL: https://ebensburgpa.com/wp-content/uploads/2026/06/May-2026-operating-report-WWTP.pdf
- Content URL: https://ebensburg.site/document/inframark-wwtp-report-6-22-2026/
- Content note: This portable copy is not the official record and may include an automated convenience summary. Verify important details in the original document.

Executive Summary of Operations Inframark submitted the May 2026 monthly report for the Ebensburg wastewater treatment plant (WWTP) to the Borough of Ebensburg. Key operational statistics and maintenance activities included: Wastewater Volume: The plant treated a total of 27,853,000 gallons during the month, averaging 898,484 gallons per day. Sludge Disposal: The centrifuge was operated weekly, resulting in 8. 99 tons of dry sludge sent to the landfill. Lighting Upgrades: Staff replaced damaged high-pressure sodium fixtures with new LED lights to improve safety and reduce electrical costs. Equipment Repairs: UV Unit: A nonfunctional UVT sensor was repaired by replacing a damaged 1-inch glass rod with an acrylic round rod. Generator: Annual preventive maintenance was performed on the Cummins generator. A factory exercise program was identified as the cause of monthly power outages and has been deleted from the panel. Influent Sampler: New pump tubing was installed to replace old, cracked, and leaking lines. SBR #4 Air Valve: The AUMA actuator failed, preventing the valve from shutting. It was replaced, and the old unit was sent to the factory for repair. Perimeter Fence: Repairs were completed on fence sections damaged by a tree. Future Planning: Contractors were onsite to quote necessary repairs, which will be budgeted for in capital planning. Health & Safety Accident Record: There were no accidents in May. Personnel have now worked 2,312 days (6 years and 5 months) without an accident or injury. Training: Inframark conducted weekly tailgate meetings, safety flash reports, and process control meetings. Upcoming Maintenance (On the Radar) The following items are scheduled or pending for future attention: SCADA programming Lawn repairs Influent splitter box lid repair SBR #2 air valve Lighting Personnel and Certifications The following staff members are listed with their titles and operator certifications: Randy Lauer (Operator II): PA Class A, E; Wastewater Subclass 1,2,3,4 Kyle Smiley (Operator III): PA Class A, E; Water Subclass 1,10,11,12; Wastewater Subclass 1 Tony Perott (Operator I): PA Class C, E; Water Subclass 1,6,7,8,12 Shawn Jones (Mechanic II): NA Joseph Pompa (Operator in Training): Training for PA DEP exam Luke Byrne (Project Manager): PA Class A, E; Water Subclass 1,7,8,10,11,12; Wastewater Subclass 1,3,4