Ebensburg WWTP Monthly Report - March 2023
Submitted by: Inframark Water Infrastructure Operations
Date of Report Submission: April 24, 2023
Recipient: Ebensburg Borough Authority Members
Executive Summary
During March 2023, the Ebensburg wastewater treatment plant treated 22. 365 million gallons of clean water discharged to Howells Run — averaging . 721 million gallons per day. All operational and testing requirements were met.
- Sludge sent to landfill: 8. 585 tons
- Centrifuge operation: Ran as needed throughout the month
On the Radar
- Influent valve replacement project scheduled to begin April 24, 2023, handled by Hickes contractor.
- All 4 replacement valves are already on site.
Operations & Compliance
Testing Schedule:
- SBR tank testing (for process control): Mondays, Wednesdays, Fridays
- Influent/effluent compliance testing (for DEP reporting): Tuesdays, Thursdays
- All data entered daily into computer system for monthly reporting
- Monthly reports submitted electronically to DEP by the 28th of each month
Plant Operations:
- Daily plant rounds and equipment checks performed multiple times per shift
- Centrifuge operated as needed
- Influent screening unit hosed and cleaned daily
- All work orders completed for the month
Maintenance & Repair:
- Greased decanters on SBR tanks
- Monthly safety inspection completed
- Centrifuge building floor hosed/cleaned as needed
- Control building floors swept and mopped weekly
- Grass/weeding started around plant grounds for the season
- Replaced polymer pump on centrifuge (old unit shut off unexpectedly)
Financial Update – Maintenance Expenditures:
| Vendor |
Amount |
Item Description |
| Scanlan |
$65. 24 |
New bulbs for MCC panel |
| Grainger |
$310. 06 |
New cable and fittings for SBR mixers |
| Ace Hardware |
$70. 31 |
Tarp straps and rope for dumpster |
| LB Water |
$32. 86 |
PVC fittings for centrifuge water line |
| Total |
$478. 47 |
Contract Caps (WWTP):
| Category |
Contract Total/Year |
March 2023 |
Year-to-Date |
Remaining Balance |
| Maintenance Cap |
$25,691. 76 |
$478. 47 |
$6,917. 89 |
$18,773. 87 |
| Sludge |
$84,782. 76 |
$1,362. 56 |
$8,520. 56 |
$76,262. 20 |
Health & Safety
- Zero accidents reported in March 2023
- Personnel have worked 6,633 days (18 years 1 month) without an accident or injury
Inframark Training & Presentations Covered:
- Weekly tailgate meetings
- COVID-19 news and updates
- Personal Protective Equipment (PPE)
- Cyber security updates
Personnel & Certifications
| Name |
Title |
Wastewater Operator Certifications |
| Michael Montgomery |
Plant Manager |
PA Class A, E; Wastewater Subclass 1,2,3,4 |
| Sharon Burkett |
Lab Supervisor |
PA Class A, E; Wastewater Subclass 1,2,3,4,5 |
| Kyle Smiley |
Operator |
PA Class A, E; Water Subclass 1 |
| — |
Operator in Training |
(No certification listed) |
This report confirms full compliance with operational standards, timely maintenance, and strong safety performance during March 2023. Residents can expect continued reliable service from the Ebensburg WWTP under Inframark’s management.