Ebensburg WWTP Monthly Report - March 2023

Submitted by: Inframark Water Infrastructure Operations
Date of Report Submission: April 24, 2023
Recipient: Ebensburg Borough Authority Members


Executive Summary

During March 2023, the Ebensburg wastewater treatment plant treated 22. 365 million gallons of clean water discharged to Howells Run — averaging . 721 million gallons per day. All operational and testing requirements were met.

  • Sludge sent to landfill: 8. 585 tons
  • Centrifuge operation: Ran as needed throughout the month

On the Radar

  • Influent valve replacement project scheduled to begin April 24, 2023, handled by Hickes contractor.
  • All 4 replacement valves are already on site.

Operations & Compliance

Testing Schedule:

  • SBR tank testing (for process control): Mondays, Wednesdays, Fridays
  • Influent/effluent compliance testing (for DEP reporting): Tuesdays, Thursdays
  • All data entered daily into computer system for monthly reporting
  • Monthly reports submitted electronically to DEP by the 28th of each month

Plant Operations:

  • Daily plant rounds and equipment checks performed multiple times per shift
  • Centrifuge operated as needed
  • Influent screening unit hosed and cleaned daily
  • All work orders completed for the month

Maintenance & Repair:

  • Greased decanters on SBR tanks
  • Monthly safety inspection completed
  • Centrifuge building floor hosed/cleaned as needed
  • Control building floors swept and mopped weekly
  • Grass/weeding started around plant grounds for the season
  • Replaced polymer pump on centrifuge (old unit shut off unexpectedly)

Financial Update – Maintenance Expenditures:

Vendor Amount Item Description
Scanlan $65. 24 New bulbs for MCC panel
Grainger $310. 06 New cable and fittings for SBR mixers
Ace Hardware $70. 31 Tarp straps and rope for dumpster
LB Water $32. 86 PVC fittings for centrifuge water line
Total $478. 47

Contract Caps (WWTP):

Category Contract Total/Year March 2023 Year-to-Date Remaining Balance
Maintenance Cap $25,691. 76 $478. 47 $6,917. 89 $18,773. 87
Sludge $84,782. 76 $1,362. 56 $8,520. 56 $76,262. 20

Health & Safety

  • Zero accidents reported in March 2023
  • Personnel have worked 6,633 days (18 years 1 month) without an accident or injury

Inframark Training & Presentations Covered:

  • Weekly tailgate meetings
  • COVID-19 news and updates
  • Personal Protective Equipment (PPE)
  • Cyber security updates

Personnel & Certifications

Name Title Wastewater Operator Certifications
Michael Montgomery Plant Manager PA Class A, E; Wastewater Subclass 1,2,3,4
Sharon Burkett Lab Supervisor PA Class A, E; Wastewater Subclass 1,2,3,4,5
Kyle Smiley Operator PA Class A, E; Water Subclass 1
Operator in Training (No certification listed)

This report confirms full compliance with operational standards, timely maintenance, and strong safety performance during March 2023. Residents can expect continued reliable service from the Ebensburg WWTP under Inframark’s management.