# Inframark WW Report

- Summary: Ebensburg WWTP Monthly Report - March 2023 Submitted by: Inframark Water Infrastructure Operations Date of Report Submission: April 24, 2023 Recipient: Ebensburg Borough Authority Members Executive…
- Source: Ebensburg Borough
- Published: 2023-04-24
- Captured: 2026-08-10T16:42:10.366Z
- Source URL: https://ebensburgpa.com/wp-content/uploads/2023/04/March-2023-monthly-operating-report-New-copy-1-ww.pdf
- Content URL: https://ebensburg.site/document/inframark-ww-report/
- Content note: This portable copy is not the official record and may include an automated convenience summary. Verify important details in the original document.

Ebensburg WWTP Monthly Report - March 2023 Submitted by: Inframark Water Infrastructure Operations Date of Report Submission: April 24, 2023 Recipient: Ebensburg Borough Authority Members Executive Summary During March 2023, the Ebensburg wastewater treatment plant treated 22. 365 million gallons of clean water discharged to Howells Run — averaging . 721 million gallons per day. All operational and testing requirements were met. Sludge sent to landfill: 8. 585 tons Centrifuge operation: Ran as needed throughout the month On the Radar Influent valve replacement project scheduled to begin April 24, 2023 , handled by Hickes contractor. All 4 replacement valves are already on site. Operations & Compliance Testing Schedule: SBR tank testing (for process control): Mondays, Wednesdays, Fridays Influent/effluent compliance testing (for DEP reporting): Tuesdays, Thursdays All data entered daily into computer system for monthly reporting Monthly reports submitted electronically to DEP by the 28th of each month Plant Operations: Daily plant rounds and equipment checks performed multiple times per shift Centrifuge operated as needed Influent screening unit hosed and cleaned daily All work orders completed for the month Maintenance & Repair: Greased decanters on SBR tanks Monthly safety inspection completed Centrifuge building floor hosed/cleaned as needed Control building floors swept and mopped weekly Grass/weeding started around plant grounds for the season Replaced polymer pump on centrifuge (old unit shut off unexpectedly) Financial Update – Maintenance Expenditures: Vendor Amount Item Description Scanlan $65. 24 New bulbs for MCC panel Grainger $310. 06 New cable and fittings for SBR mixers Ace Hardware $70. 31 Tarp straps and rope for dumpster LB Water $32. 86 PVC fittings for centrifuge water line Total $478. 47 Contract Caps (WWTP): Category Contract Total/Year March 2023 Year-to-Date Remaining Balance Maintenance Cap $25,691. 76 $478. 47 $6,917. 89 $18,773. 87 Sludge $84,782. 76 $1,362. 56 $8,520. 56 $76,262. 20 Health & Safety Zero accidents reported in March 2023 Personnel have worked 6,633 days (18 years 1 month) without an accident or injury Inframark Training & Presentations Covered: Weekly tailgate meetings COVID-19 news and updates Personal Protective Equipment (PPE) Cyber security updates Personnel & Certifications Name Title Wastewater Operator Certifications Michael Montgomery Plant Manager PA Class A, E; Wastewater Subclass 1,2,3,4 Sharon Burkett Lab Supervisor PA Class A, E; Wastewater Subclass 1,2,3,4,5 Kyle Smiley Operator PA Class A, E; Water Subclass 1 — Operator in Training (No certification listed) This report confirms full compliance with operational standards, timely maintenance, and strong safety performance during March 2023. Residents can expect continued reliable service from the Ebensburg WWTP under Inframark’s management.
