- Summary: Ebensburg Wastewater Treatment Plant (WWTP) Report - May 2023 Submitted by: Inframark Water Infrastructure Operations Date of Report: June 26, 2023 Executive Summary Water Treated: The plant treated…
- Source: Ebensburg Borough
- Published: 
- Captured: 2026-08-10T16:42:10.366Z
- Source URL: https://ebensburgpa.com/wp-content/uploads/2023/06/Inframark-Reports-May-2023.pdf
- Content URL: https://ebensburg.site/document/inframark-reports-6-26-2023/
- Content note: This portable copy is not the official record and may include an automated convenience summary. Verify important details in the original document.

Ebensburg Wastewater Treatment Plant (WWTP) Report - May 2023 Submitted by: Inframark Water Infrastructure Operations Date of Report: June 26, 2023 Executive Summary Water Treated: The plant treated 16. 007 million gallons of clean water to Howells Run in May 2023, averaging . 516 million gallons per day. Compliance: All testing and operational requirements were met for the month. Sludge Disposal: 11. 776 tons of sludge were sent to the landfill. Key Project: The Influent Valve Project is complete, with new valves and actuators functioning well. Operations & Maintenance Testing Schedule: SBR tank testing occurs on Mondays, Wednesdays, and Fridays. Influent/effluent compliant testing is done on Tuesdays and Thursdays for DEP reporting. Work Orders: 314 work orders were completed during the month, including 4 corrective actions for influent valves. Maintenance Tasks: Greased decanters on SBR tanks. Daily cleaning of the influent screening unit and building floors. Weekly sweeping and mopping of control building floors. Grass cutting and weed eating around the plant as needed. Financial Update (WWTP) Maintenance Expenditures: Total maintenance spending for May included costs from vendors such as Uni-Mart ($350. 62), Ace Hardware ($595. 70), and MXU Water Meters ($6,133. 00). Budget Caps: Maintenance Cap: The contract total per year is $25,691. 76. As of May 2023, $8,715. 99 was spent, leaving a remaining balance of $14,291. 04. Sludge Cap: The contract total per year is $84,782. 76. As of May 2023, $3,470. 87 was spent, leaving a remaining balance of $68,188. 78. Health & Safety Accident Record: There were no accidents in May. Personnel have worked 6,694 days (18 years, 2 months) without an accident or injury. Training: Inframark conducted weekly tailgate meetings, provided COVID-19 updates, and reviewed Personal Protective Equipment (PPE) and cyber security. Personnel Michael Montgomery: Plant Manager (PA Class A, E, Wastewater Subclass 1,2,3,4) Sharon Burkett: Lab Supervisor (PA Class A, E, Wastewater Subclass 1,2,3,4,5) Kyle Smiley: Operator (PA Class A, E, Water Subclass 1) Jake Dumm: Operator in Training Ebensburg Water Treatment Plant (WTP) Report - May 2023 Submitted by: Inframark Water Infrastructure Operations Date of Report: June 26, 2023 Executive Summary Water Treated: The plant treated 27,967,000 gallons of reservoir water in May, averaging 902,161 gallons per day. Purchased Water: An average of 57,839 gallons per day was purchased from Saltlick and blended into the distribution system. Inspections: A full sanitary inspection by the Pennsylvania DEP on May 24-25 was successful with no violations noted. Minor deficiencies (lack of a carbon monoxide detector and damaged fencing) were addressed immediately. Maintenance: Staff replaced a 120V relay and check valve on a sump pump, and replaced a failed caustic chemical feed line. Operations & Maintenance Production: Daily production fluctuated between 786,000 and 1,070,000 gallons. Filter Maintenance: Filters are washed every 144 hours (once per week). Work Orders: Inframark staff completed 88 work orders in May, including: Caustic pump equipment replacement. Greasing DAF recycle pump and scraper. Fire extinguisher, SCBA, and ladder inspections. Cleaning clarifier troughs and the lagoon vault. Financial Update (WTP) Maintenance Expenditures: Total maintenance spending for May included costs from vendors such as Heritage Environmental ($502. 00), USA Blue Book ($300. 18), and Scanlan Electric ($139. 42). Budget Caps: Maintenance Cap: The contract total per year is $26,522. 00. In May, $1,289. 24 was spent, leaving a remaining balance of $23,063. 17. Health & Safety Accident Record: There were no accidents in May. Personnel have worked 1,216 days (3 years, 5 months) without an accident or injury. Training: Inframark conducted weekly tailgate meetings, provided COVID-19 updates, reviewed PPE, and performed a lock out tag out review. Personnel Luke Byrne: Water Plant Manager (PA Class A, E, Water Subclass 1,7,8,10,11) Kyle Smiley: Operator (PA Class A, E, Subclass 1) Jacob Dumm: Operator in Training (Preparing for Exam)