# Inframark Reports

- Summary: Ebensburg Municipal Authority: December 2022 Monthly Reports Inframark submitted two separate monthly reports for the Ebensburg water and wastewater treatment facilities, dated January 23, 2022.…
- Source: Ebensburg Borough
- Published: 
- Captured: 2026-08-10T16:42:10.366Z
- Source URL: https://ebensburgpa.com/wp-content/uploads/2023/01/Inframark-Reports-Jan-2023.pdf
- Content URL: https://ebensburg.site/document/inframark-reports-01-23-2023/
- Content note: This portable copy is not the official record and may include an automated convenience summary. Verify important details in the original document.

Ebensburg Municipal Authority: December 2022 Monthly Reports Inframark submitted two separate monthly reports for the Ebensburg water and wastewater treatment facilities, dated January 23, 2022. Water Treatment Plant (WTP) Report Executive Summary & Operations: Production: The plant treated 28,377,000 gallons of reservoir water in December (avg. 915,387 gallons/day). An additional 63,303 gallons per day were purchased from Saltlick. Elevated Tank: The tank was filled on December 7th for sampling. While samples were compliant, the PA DEP denied reactivation until construction completion is submitted and a fee is paid. Filter Inspection: Filter #3 was inspected and found to be in excellent condition; media analysis results are pending. Unaccounted Water: Inframark discovered a required water study/plan was never submitted in 2018. They composed and submitted this document to the PA DEP on December 20th and are awaiting a response. Upcoming Tasks: Service clarifiers, DAF service, rapid mix motor work, and DAF variable frequency drive programming. Maintenance & Repair: Staff completed 80 work orders in December. Key tasks included ladder inspections, greasing DAF pumps/scrappers, fire extinguisher checks, SCBA inspections, sump pump exercises, and cleaning lagoon screens. Financial Update: Maintenance Expenditures: Total spending included $2,200 for annual filter media analysis/inspection (Water Service Professionals) and $950. 16 for a rapid mix motor (Ram Industrial Services). Caps: The maintenance cap had a contract total of $26,010. 00 per year. With $4,536. 85 spent this month, the remaining balance is $6,513. 41. Health & Safety: No accidents occurred in December. Personnel have worked 1,065 days (2 years, 11 months) without an injury. Training covered tailgate meetings, COVID-19 updates, and personal protective equipment. Personnel: Luke Byrne: Water Plant Manager (PA Class A, E, Water Subclass 1,7,8,10,11). Kyle Smiley: Operator (PA Class A, E, Subclass 1). Wastewater Treatment Plant (WWTP) Report Executive Summary & Operations: Production: The plant treated 29. 650 million gallons of clean water to Howells Run (avg. . 956 million gallons/day). Sludge: 2. 982 tons of sludge were sent to the landfill. Compliance: SBR tank testing occurred Mon/Wed/Fri; influent/effluent compliant testing occurred Tue/Thurs. All data is entered daily for monthly reporting to the DEP. Upcoming Projects: The Borough Engineer is investigating a new 20" influent valve for SBR tank #2. Contractor Hickes visited the site on December 7, 2022, to assess the replacement project. Maintenance & Repair: Key tasks included greasing decanters on SBR tanks, monthly safety inspections, and cleaning the centrifuge building floor. Financial Update: Maintenance Expenditures: Total spending was $146. 23, covering flashlights ($28. 62), gas ($15. 00), and fire extinguisher inspection ($102. 61). Caps: Maintenance Cap: Contract total $23,895. 24/year. Remaining balance: $1,099. 69. Sludge Cap: Contract total $78,854. 40/year. Remaining balance: $27,478. 66. Health & Safety: No accidents occurred in December. Personnel have worked 6,540 days (17 years, 9 months) without an injury. Training covered tailgate meetings, COVID-19 updates, personal protective equipment, and cyber security. Personnel: Michael Montgomery: Plant Manager (PA Class A, E, Wastewater Subclass 1,2,3,4). Sharon Burkett: Lab Supervisor (PA Class A, E, Wastewater Subclass 1,2,3,4,5). Kyle Smiley: Operator (PA Class A, E, Water Subclass 1).
